Agr herten. AGR Betriebsfuehrung GmbH


Erich Modernization AGR Herten
  • Chi Hier werden kommunale Siedlungsabfälle, Gewerbeabfälle und Sonderabfälle sicher entsorgt, durch den Verbrennungsprozess wird wertvolle Energie erzeugt.
01.04.2020
Horacio agr.
  • Dave The project is scheduled for completion by December 2018.
  • Dylan This is because they could assume that the complete project would be technologically from one source and smoothly implemented, as well as planned and organised without delays. Hier werden jedes Jahr bis zu 700.
30.04.2020
Horacio AGR Betriebsfuehrung GmbH
  • Bennett It was then successfully carried out, costing only a little extra time.
12.04.2020
Hunter AGR
  • Harrison Ich stimme zu, dass meine Angaben aus dem Kontaktformular zur Beantwortung meiner Anfrage erhoben und verarbeitet werden.
  • Hugh After all, in this case it depends upon a huge amount of weight — over a tonne of steel to be exact.
20.05.2020
Emory Case Studies
  • Elliott Care and responsibility, pays off.
28.03.2020
Reynaldo AGR Abfallentsorgungs
  • Winfred Also, the basis for this is not least because of the operator's really finely-meshed control and revision management.
  • Robby After over 20 years of reliable operation, one of the two steel stack outlet tops was now soon ready for replacement. Furthermore both desulfurization units responsible for the overhaul process of the flue gas are provided by our cross-flow heat exchanger solution.
08.04.2020
Carlton AGR Herten
  • Gilbert.
  • Merlin Mit 950 Mitarbeitern und einem Umsatz von ca. And a great height: over 100 metres above ground.
26.04.2020
Cecil Modernization AGR Herten
  • Keven It needed to be directly fixed to the new stack outlet top and to be welded with it to the steel ring of the vent — i.
  • Chang The last act of this great drama: Putting on the outlet top at a dizzying height using a heavy-duty crane.
08.04.2020
Jefferson AGR Herten
  • Joshua Detaillierte Informationen zum Umgang mit Nutzerdaten finden Sie in unserer. After being almost completely renewed and expanded in 1986, a large part flue gas scrubber awaited renovation.
  • Joseph Because their area of work requires specialist know-how. The fuel cell truck is expected to be delivered in May of 2020, just in time to be presented at the leading trade fair for water, sewage, waste and raw material management , taking place in Munich from the 4 th-8 th of May 2020.
10.04.2020